At one of America’s leading heart procedure institutes, the hospital
was facing rising supply costs from new product introductions and a
rising case backlog due to limited Cath Lab room availability. There
were questions around the need to build additional capacity.
was facing rising supply costs from new product introductions and a
rising case backlog due to limited Cath Lab room availability. There
were questions around the need to build additional capacity.
An assessment identified the following opportunities:
- Delayed first case on-time starts and turnovers
- Operational performance metrics were not measured vs. the goal
- Reasons for delays were not measured or understood
- Communication disconnect between operations and physicians
- Physiciansfelt like they couldn’t get their cases on the schedule in a timely fashion
- Variance in the cost / case among physicians
- Patient flow was disrupted due to lack of material availability
Carpedia partnered with the hospital leaders to decrease supply costs and to increase lab utilization
- Redesigned layout and coordination between Cardiac Observation Unit and Holding area nurses in order to increase outpatient cases
- Created visibility to on-time start performance
- Rolled out a phone communication app to notify physicians when the patient is ready for surgery
- Adjusted case length scheduling parameters to reduce observed gaps between cases
- Identified bulk buying opportunities to reduce prices
- Developed tiered pricing structures
- Managed appropriate SKU substitution
- Re-stocking rooms in order to reduce instance of missing supplies
The Results
At the conclusion of the engagement, a cultural shift was evident as teamwork, collaboration and mutual accountability took form.
To ensure sustainability, steering committees were established to align allstakeholders, including physicians.
Specific results include:
- 2.3:1 Return on Investment
- $2.6M in annualized savings (labor & supplies)
- 7% improvement in cost per case
- Eliminated backlog with a sustained 11% case volume increase
- First case on-time starts improved from 14% to 54% at one facility and from 14% to 69% at another(339% overall improvement)
- Room turnaround time decreased by 31% for both locations